Bhubaneswar: Odisha government on Thursday stepped up measures to tackle the approaching cyclone and the possibility of flooding in the state.
Apart from releasing water from the reservoirs, the authorities have intensified drainage clearance, desilting and removal of obstructions at vulnerable locations across the state to prevent flooding and waterlogging.
Officials said the Water Resources Department has been closely monitoring the movement of the weather system and has initiated precautionary measures to minimise potential flood risks.
As part of the preparedness measures, the gates of all reservoirs will remain closed from today, while water levels have been reduced by 50 per cent to accommodate possible excess inflow following heavy rainfall.
Engineer-in-Chief (EIC) of the department, Dillip Kumar Rout, said there is currently no possibility of a major flood in the state. He also clarified that the approaching cyclone is not expected to have any significant impact on the Hirakud reservoir
Despite the absence of an immediate and major flooding threat, the State government is keeping close surveillance over seven major rivers – Bansadhara, Brahmani, Baitarani, Rushikulya, Mahanadi, Subarnarekha and Budhabalanga.
Officials have stepped up vigilance along these river systems in view of the possibility of heavy rainfall and increased water inflow.
Similarly, the department has prioritised the operations in 11 districts, including Ganjam, Gajapati, Kandhamala, Puri, Khordha, Nayagada, Rayagada, Koraput, Malkangiri, Kalahandi and Boudh, an official statement said.
In Bhubaneswar, clearance work is underway at Gangua Nalla along the National Highway bypass and other vulnerable stretches. In Ganjam district, the Drainage Division, Berhampur, has intensified inspections, desilting and removal of obstructions at Sapua Nalla, Bahana Nalla and Surya Nalla.
Similar operations are being carried out at Taptapani Nalla near Phasiguda village under Digapahandi block.
Field teams are regularly monitoring vulnerable drainage channels and identified waterlogging-prone locations. Adequate manpower, machinery and emergency resources have also been kept on standby to ensure a prompt response during heavy rainfall.
The department is coordinating with district administrations and local authorities to maintain uninterrupted stormwater discharge and minimise the possibility of flooding, while protecting lives and property during the cyclone.